Winter and wet weather delays are common occurrences which disrupt the pace, productivity and overall efficiency of a building construction project. India faces a rigorous onset of monsoon which can hinder the ongoing urbanization waves as well as harsh inters across the northern regions with heavy snowing in a few states.
The traditional brick and mortar or concrete construction technologies are not feasible for winter weather months owing to it he proper curing requisites for the mortar as well as the risk of consistent halts in projects, an off-site building construction solution such as Prefabricated House Construction is a viable option to practice.
The flaws with traditional construction methodologies during winter seasons
Severely plagued by the harsh and adverse weather conditions occurring during winter, traditional building construction processes are risked of material damage and consistent weather delays during extreme cold temperatures. The moisture caused due to wet weather and even snowing can cause wood to warp, cement failure to bond or set property molding risks for interiors as well as prolonged drying periods for wet mixture plasters, mortar or even flooring.
Thus, sticking with conventional construction methods during rain or snow can risk optimum structural integrity of a building and result in severe material losses, need of repairs and elevated risks of quality inconsistencies.
Prefabrication as an all-weather safe construction methodology feasible for winter infrastructure development
Opting for prefabrication to build homes, office buildings, schools, industrial enclosures or Prefabricated Farmhouse structures makes literally no impact on the quality, performance or safety of the project as well as the structure whether you build in winter snow or rain.
The modular off-site construction of prefabricated enclosures is an efficient and safe process to follow during winters. The wide array of aspects associated with building construction which are vulnerable to cold weather can best be controlled and optimized by off-site construction technology.
An optimum construction method for projects that span the winter season
Following the right preferences of build methodology, you can save time, costs, materials as well as hassles on winter construction projects. Modular and off-site based Prefabricated House Construction keeps the project timelines on pace even during winter weather and prevents any structural quality and safety anomalies in the build.
Stated below are the reasons why prefabrication is ideal for wet weather and winter season construction -
Prefabricating involves use of steel frames and steel enveloped insulated panels which ensure better winter performance
Off-site manufacturing and on-site installation of Prefabricated Farmhouse and building structures is not restricted by winter weather conditions
No special measures are required for prefabricated construction during cold temperatures
None of the processes and materials associated with Prefabricated House Construction requires time to cure
EPACK prefabrication technology makes possible multi-season infrastructure development consistency
Prefabricated Farmhouse structures support a wide range of exterior cladding
Off-site modular building development offers workers comfortable work environments